coral-princess-anchored-yokohama-daisan-bridge-scaled

Save installation and operation costs by smart DC link integration

  • Higher Charging voltage: By adopting medium voltage, our systems require significantly lower currents, which reduces the size and cost of conductors and associated hardware. This sixfold reduction in current requirements leads to more efficient, streamlined operations.
  • Reduced installation costs: Our advanced DC links techniques, including battery energy storage systems (ESS) can cut grid installation costs and connection fees bu up to 85%. This drastic reduction makes our shore-power solutions not only more affordable but also quicker to deploy.
  • Accelerated ROI: The return on investment for shore-power operations can be achieved in as little as two years. Incorporating battery storage for grid stabilization can further shorten this ROI period, adding flexibility and value to energy management strategies.
  • Enhanced renewable integration: Our systems are designed to integrate up to 100% of local regenerative power sources, such as wind and solar, seamlessly converting and using green energy to power maritime operations and support sustainability goals.